CityLink Asphalt Resurfacing

Bitu-mill were successful in winning a joint venture bid with Citywide for the Profiling and Asphalt Laying component of the CityLink Asphalt Resurfacing project. These works stretched in both directions from Bulla Road, across the Bolte Bridge to the Westgate Fwy. Due to the high ride ability and stringent quality control measures, Bitu-mill invested in an asphalt transfer vehicle (Shuttle Buggy 2500) which greatly contributed to the successful placement of 30,000+ tones of asphalt. The project was delivered during the Christmas period with minimal hold ups to the public and a very satisfied client in Citywide and CityLink / Transurban – a great achievement for all the Bitu-mill team involved on this project.

 

Back to project gallery
  • Client: CityLink / Transurban
  • Services: Asphalt Resurfacing