Pakenham Racecourse Tunnel

Two tunnels – the first a 50 metre tunnel under the course proper at the new Pakenham Racecourse in Tynong.  The other is 50m tunnel that sits directly in-line with the course proper tunnel running under the training tracks into the centre of the course.  Both tunnels are designed for vehicle and horse traffic to travel from the outside of the course proper to the training tracks in the centre of the course.

Constructed using 9m wide by 4m high precast Bebo arches placed on insitu concrete footings.

 

Back to project gallery
  • Client: Pakenham Racecourse
  • Services: Civil Construction, Tunnel