Bitu-mill were engaged by Regional Roads Victoria (North-East Region) to construct a new roundabout to improve road safety on the Murray Valley Highway within the Yarrawonga township, prior to the peak summer holiday period.

The site was particularly busy for vehicle and pedestrian traffic as directly adjoining the site was residential, commercial, medical, aged care, CFA and school properties. Through traffic was maintained for the duration of the work which included service relocation, significant stormwater drainage, earthworks and pavement construction, concrete kerb, channel, islands, retaining wall and footpath, 3 x layered asphalt, line marking and streetlighting.