Project Description

Project McPhillips Road Reconstruction Commencement April 2017
Location McPhillips Road, Bannockburn Completion July 2018
Client Golden Plains Shire Value $600k

Overview

Bitu-mill were engaged by Golden Plains Shire to complete Stage 1B of the McPhillips Road reconstruction works, for a 370m long section between Imperial Way and Victor Street.

Scope

Storm Water Drainage and Kerb Construction

  • Construction of new stormwater drainage line and pits
  • Construction of a kerb and Channel

Footpath Construction

  • Construction of pedestrian footpath for better access for residents and continuity of surrounding paths

Sealing and Asphalt Works

  • Pavement widening for safer roads
  • Sealing and Asphalt works
  • Road line marking
  • Topsoiling of nature strips

Outcomes

  • Minimum disruption to local residents

  • Completed within project timeframe and positive feedback from clients

  • Collaboratively resolved service clashes with the client

  • All State Concrete completed footpath and kerb works

Completed Works

Before photo of road without footpath.Completed road and footpath