Project Description

Project | McPhillips Road Reconstruction | Commencement | April 2017 |
Location | McPhillips Road, Bannockburn | Completion | July 2018 |
Client | Golden Plains Shire | Value | $600k |
Overview
Bitu-mill were engaged by Golden Plains Shire to complete Stage 1B of the McPhillips Road reconstruction works, for a 370m long section between Imperial Way and Victor Street.
Scope
Storm Water Drainage and Kerb Construction
- Construction of new stormwater drainage line and pits
- Construction of a kerb and Channel
Footpath Construction
- Construction of pedestrian footpath for better access for residents and continuity of surrounding paths
Sealing and Asphalt Works
- Pavement widening for safer roads
- Sealing and Asphalt works
- Road line marking
- Topsoiling of nature strips
Outcomes
Minimum disruption to local residents
Completed within project timeframe and positive feedback from clients
Collaboratively resolved service clashes with the client
All State Concrete completed footpath and kerb works